Descargar Imprimir esta página

Crivit 353799 2010 Instrucciones De Montaje página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
• The manufacturer accepts no liability for
accidents which occur as a result of ignoring
the safety information above or inappropriate
handling.
• When using the product always adhere to
the operating instructions of the pedelec or
bicycle manufacturer.
P reventing damage to the
product!
• In order to prevent damage to the bicycle, en-
sure that cables and wires do not get caught
on the product.
• Carbon frames are highly sensitive to pres-
sure! When mounting, handle your bicycle
with care to prevent damage to it.
Important pre-installation
information
WARNING! The floor and ceiling brackets
must be screwed in!
If the product is not screwed to the floor and ceil-
ing, the manufacturer is absolved of all liability.
WARNING! Before you begin installing the
product, measure the height between the floor
and the ceiling.
WARNING! Installing the product requires at
least two people due to its size.
Suitable installation site
For ceiling installation, a concrete ceiling or a
load-bearing wooden beam is suitable. For floor
installation, a concrete foundation or concrete
slabs of at least 50 x 50 x 5cm (L x W x H) are
suitable.
Note: if you attach the product to a wooden
beam, you must screw the product to it, as wood
warps depending on the temperature and humid-
ity. Enquire at a specialist retailer about suitable
installation materials.
Note: alternative installation conditions require
inspection of load-bearing capacity and durabili-
ty by a specialist company.
12
GB/IE
Suitable installation materials
Before installing the product, the installation
materials must be determined.
Enquire at a specialist retailer about suitable instal-
lation materials for the floor and ceiling brackets.
Installation
To install the product you will need the following
tools (not included in the package contents):
a suitable drill, measuring tape, and a Phillips
screwdriver.
Note: to ensure optimal stability of the product,
we recommend screwing the floor and ceiling
brackets in place.
Note: maintain sufficient distance from the wall
so that parts of the bicycle do not dirty the walls.
Installing the upper slip-resistant cap
1. Position the slip-resistant cap (4) in the desired
position and mark two holes with a pencil
(Fig. B).
2. Using the appropriate tool, drill two holes in
the marked places. Insert a wall plug (7) into
each hole (Fig. C).
Note: use other wall plugs and screws if
required for the installation surface.
Installing the bottom bracket
1. Plumb the exact position of the bottom
bracket (1a) with a cord (not included in the
package contents). Mark the corresponding
spot and mark two opposing holes with a
pencil (Fig. D).
Note: the drill holes of the bottom bracket (1a)
must be perpendicular to the drill holes of the
top bracket.
2. Using the appropriate tool, drill two holes in
the marked places. Insert a wall plug (7) into
each hole (Fig. E).
Note: use other wall plugs and screws if
required for the installation surface.
Installing the telescopic pole
Important! Before installation, make sure that
the clamping sleeves with the locking levers are
sitting firmly on the thicker pipe of the telescop-
ic pole. Check the positioning of the cylinder
head screws (1e) and tighten them if necessary
(Fig. F).

Publicidad

loading