Single-phase with GFCI or AFCI breakers
1. Uninstall the upstream A/GFCI breaker of the main electrical panel and replace with normal breakers,
then install the A/GFCI breakers into the EcoFlow AFCI/GFCI Box (please refer to the manual of
EcoFlow AFCI/GFCI Box for details).
2. Follow steps below to wire up the product:
2.1. Connect the grounding wire from the ground bus of the main electrical panel to the EcoFlow AFCI/
GFCI Box .
2.2. Connect input wires from SHP to corresponding breakers of the main electrical panel.
2.3. Connect output wires from SHP to corresponding breakers of the EcoFlow AFCI/GFCI Box.
2.4. Connect A/GFCI breakers of the EcoFlow AFCI/GFCI Box back to the load port of the main
electrical panel.
Metallic conduit
19
Metallic conduit
Main
Two Ne w Beaker s adde d
fo r Delta Pro Chargin g