Descargar Imprimir esta página

Preparation For Operation - Gymrex GR-BE 150 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 57
1 - Backrest
2 - Leg lock rollers
3 - Backrest height lock
4 - Footrest
5 - Anti-slip base
6 - Roller for easy movement

3.2. Preparation for operation

POSITIONING OF THE UNIT
The unit should be placed on a hard, flat and dry surface. The adjacent surface
should be non-slip. Leaving a free space of 2000mmx2000mm around the unit is
recommended.
ASSEMBLY OF THE UNIT
In order to properly assemble the unit you should prepare and use the following
tools

Publicidad

loading