English
Trigger
Push lever
(2) Installing the battery.
Do not operate the push lever or trigger while
installing the battery.
(3) Turn on the Power switch.
Nailing operation
indicator
Battery indicator
Nailing
operation switch
20
Handle
Battery
Insert
Power indicator
Power
switch
Turn on the Power switch by push and hold on Power
switch more than 1 second.
Make sure the power indicator is lighting in green,
and nailing operation indicator is lighting in blue.
(SINGLE SEQUENTIAL ACTUATION MECHANISM)
NOTE
● Do not press the push lever and/or pull the trigger
during the process of turning the power switch ON.
Doing so will prevent the power switch from turning
ON.
Light in blue
[Auto power off ]
When the power is turned on but the Nailer is not
used for 30 minutes, the Nailer is automatically
turned off . To turn on again, press the power
switch.
Never leave the Nailer with the power on. This
could result in an accident.
Nailing operation indicator
● Lighting (Blue):
SINGLE
SEQUENTIAL
MECHANISM
● Blinking (Blue):
CONTACT ACTUATION MECHANISM
Make sure the battery indicator is not lighting or
blinking.
If the battery indicator is lighting or blinking in red, the
battery doesn't have enough power and it needs to be
charged.
Light in green
WARNING
ACTUATION