Descargar Imprimir esta página

TOPDON BT600 Manual Del Usuario página 19

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 85
2) Confirm the engine has been started and press [ENTER /
PRINT].
3) Ripple test will be conducted before the charging test starts,
the test result will be displayed in graph and will jump to the
next step after 5 seconds.
4) The tool will prompt you to increase the RPM to 2500 and
keep it for 5 seconds. Do as requested and press [ENTER /
PRINT] to continue.
CHARGING TEST
PLEASE START ENGINE, PRESS
ENTER TO CONTINUE.
Figure 4.3.2
RIPPLE TEST
14.37V
04mV
Figure 4.3.3
CHARGING TEST
INCREASE SPEED TO 2500 R/MIN ,
KEEP IT FOR 5 SECONDS . PRESS
ENTER TO CONTINUE
Figure 4.3.4
EXIT
ENTER
EXIT
ENTER
EN I 19

Publicidad

loading