Descargar Imprimir esta página

Husqvarna Automower EPOS Plug-in Kit Manual De Usuario página 115

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 204
7.
Connect the low-voltage cable to the reference
station and the power supply.
8.
Attach the low-voltage cable to the wall from the
reference station to the power supply with cable
ties.
CAUTION:
cable is not attached tightly with cable
ties it can be damaged in hard wind.
9.
Put the power supply 30-200 cm / 1-6.5 ft. above
To examine where to put the
the ground. Refer to
power supply on page 107 .
10. Connect the power supply cable to a 100-240V
power outlet.
11. Wait until the LED status indicator is solid green.
First the LED status indicator flashes green for
some minutes. Refer to
reference station on page 124 .
39.10.6.2 To install the reference station on a post
1.
Attach the post tightly to a wall, roof top or the
ground. Make sure that the post cannot move or
be accidentally moved.
2.
Attach the support bracket and one of the post
brackets to the arm with the 4 screws (4 mm hex
key).
Note:
The post brackets are available in 2
dimensions to fit different dimensions of the
post. Select the applicable post bracket for your
installation.
3.
Put the arm on top of the post.
1944 - 001 - 13.01.2023
If the low-voltage
LED indicator lamp on the
Note:
The reference station must be installed at
the top of the post.
4.
Attach the reference station to the post with the 2
screws (4mm hex key).
5.
Pull the cable on the reference station through the
slot in the arm and install the reference station on
the arm.
Installation - 115

Publicidad

loading