6.
Attach the connector to the clips on the arm.
7.
Tighten the screw (Torx 20) on the arm of the
reference station.
T20
116 - Installation
8.
Connect the low-voltage cable to the reference
station and the power supply. Refer to
where to put the power supply on page 107 .
9.
Attach the low-voltage cable to the post from the
reference station to the power supply with cable
ties.
CAUTION:
cable is not attached tightly with cable
ties it can be damaged in hard wind.
10. Put the power supply 30-200 cm / 1-6.5 ft. above
To examine where to put the
the ground. Refer to
power supply on page 108 .
11. Connect the power supply cable to a 100-240V
power outlet.
12. Wait until the LED status indicator is solid green.
First the LED status indicator is flashing green for
some minutes. Refer to
reference station on page 124 .
39.10.7 Installation of the map objects
Read and understand the instructions about where to
install the map objects. Refer to
install the virtual boundaries on page 109 .
On the map you can install the objects that follow in the
app:
Work areas (A)
•
•
Stay-out zones (B)
Transport path (C)
•
Charging station (D)
•
Maintenance point (E)
•
•
Reference station (F)
Work area (Secondary area) (G)
•
To examine
If the low-voltage
LED indicator lamp on the
To examine where to
1944 - 001 - 13.01.2023