Regularly check the pressure-bearing components (high pressure hose) as well as the current-
−
carrying components for any damage. Defective parts must be replaced immediately with
genuine parts.
Use of non-original accessories, e.g. hose lines, connections, can in isolated cases pose the risk
−
of accidents. In case of accidents or damage caused by foreign parts liability cannot be accepted.
Modification or alteration of the device is only permitted after consultation with the manufacturer.
−
The reliability of the device is only guaranteed when used as intended.
−
Maintenance, inspection and repair work must only be performed by qualified personnel.
−
Caution: hot components only cool gradually after being shut down.
−
Safety-related parts (e.g. safety valve) may only be replaced or adjusted by the manufacturer.
−
2
Intended use / guarantee
The electric gear pump is suitable for decanting and filling of oil. The bypass valve integrated in
the pump body is at the limit of the max. delivery pressure of the pump.
EP 200-DS, EP 300-DS, EP 400-DS
For hydraulic, motor and gear oils of a low to high viscosity.
It is possible to use hose reels as well as longer conveyor lines due to the high pressure
performance of 16 bar.
Used oils may only be utilised if no solid particles are present. Any other use as well as
modification or alteration of the installation is only permitted after consultation with the
manufacturer.
If the installation is used as intended and in accordance with the instructions, we are liable under
the statutory warranty (see our Terms and Conditions).
The invoice from your dealer with the date of purchase must be enclosed with warranty claims
3
Assembly and delivery
The structure, including the individual components, is depicted on page 3.
4
Set up and operation 200-DS, EP 300-DS, EP 400-DS:
Screw telescopic suction tube (5) into angle piece (6).
-
Screw telescopic suction tube with angle piece into the R 2" connection of the tank.
-
Set gear pump (1) onto the tank. When using the pump holder for the 700/1000 liter tank, the
-
carrying handle of the pump can be removed.
Trace return hose back to the safety valve of the tank.
-
Connect suction hose (2) to the pump (1) and the angle piece (6).
-
Assemble oil filler gun (4) and pressure hose (3) at the pressure side of the pump.
-
Check all connections for a firm fit and leaks before starting the system.
Insert 220V mains plug into the socket. Check that the pump is switched off.
-
The system is now operational.
-
Press the pump's on-switch. Operate the oil filler gun until production commences.
-
If the gun is closed, the pump builds up to max. pressure and then shuts off automatically.
-
If the pressure switch fails to switch off properly, then please refer to the separate instructions for
-
adjusting the pressure switch. (In casing of the pressure switch)
When the system is not in use turn off the electric gear pump.
-
Observe safety instructions
10
/ Benzstr. 16-24 / 63165 Mühlheim a. Main / Tel:+49(0)6108-906-0 / Fax:+49(0)6108-906-120
GmbH & Co. KG
MATO
Operating manual
EP 200-DS / EP 300-DS / EP 400-DS