starting the machine
Follow all the instructions described
below with the help of picture 1:
• Open the water tap
1
sure that there is no leaking hose
connection.
• Turn on the electrical switch
turn the knob
clockwise. Make
2
sure the display turns on.
• Once the machine is on, the automatic
level starts filling up the boiler until
the proper level is reached. At this
stage, the symbol
blinks on the
display.
• After the filling phase, the group heads
start heating. The set temperature
value blinks on the display.
All manuals and user guides at all-guides.com
• After
the
temperature values stop blinking
and the set value for each group is
and make
shown.
• Straight afterwards, the boiler starts
to heat up and its set temperature
and
value blinks on the display.
7
• During this phase, the brewing groups
can be used.
• When the boiler reaches the correct
temperature, the set value stops
blinking and the unit will emit 2 bleeps
confirming the machine is ready for
use.
-> pic. 1
heating
phase,
the
WARNING:
The heating sequence starts only
when the Timer is deactivated and
the machine is turned on after it has
been completely switched off through
the main switch 2. This sequence
is conceived in order to save a good
quantity of energy during the heating
up of the machine, thus avoiding
problems of local electrical system
overloading.