Descargar Imprimir esta página

Sime AQUA 25 ErP LN Instrucciones Para El Instalador página 82

Ocultar thumbs Ver también para AQUA 25 ErP LN:

Publicidad

Idiomas disponibles

Idiomas disponibles

4
USE AND MAINTENANCE
ATTENTION: Before performing any work on the boiler, make sure that the same and its components have
cooled in order to prevent the risk of burns due to high temperatures.
4.1
TANK MAINTENANCE
The. preparation. of. hot. treated. water.
is. guaranteed. by. a. heater. in. INOX.
AISI. 316L,. complete. with. magnesi-
um. anode. for. protecting. the. heater.
6
5
7
8
82
and. inspection. flange. for. control. and.
cleaning..
The magnesium anode (20 fig. 2 -
16 fig. 2/a) should be periodically
controlled and substituted whenever
worn out.
AQUA 25-35 ErP LN
5
6
7
4.4
The. shell. can. be. completely. disas-
sembled. for. an. easy. maintenance. of.
the. boiler. by. following. the. numeric.
3
9
4
1
AQUA 25-35 INOX ErP LN
2
DISASSEMBLY
OF OUTER CASING (fig. 13)
3
8
4
1
2
Fig..13

Publicidad

loading