AQUA 25-35 ErP LN
blinking. red),. contact. an. authorised.
technician.
If,. on. the. other. hand,. the. LED. (1).
is. steady. red,. restart. manually. by.
pressing.the.button.(4).for.5.secon-
ds,.then.release.it..
If.the.pump.does.not.restart,.request.
the. intervention. of. authorised. tech-
nical.staff.
4
CLEANING AND MAINTENANCE
At.the.end.of.each.heating.season,.it.is.
essential.to.have.the.boiler.thoroughly.
90
2
bar
1
3
0
4
OPEN
checked.and.cleaned.out.
Preventive. maintenance. and. checking.
of.the.efficient.operation.of.the.equip-
ment. and. safety. devices. must. be. car-
ried. out. exclusively. by. the. authorised.
technical.staff.
ATTENTION: It is mandatory that the
dedicated power cable is replaced
only with a spare cable ordered and
connected by professionally quali-
fied personnel.
1
2
DISPOSAL OF THE EQUIPMENT
(2012/19/UE)
3
Fig..25
of.together.with.urban.waste.
It. can. be. handed. over. to. recycling.
centres,.if.there.are.any,.or.to.retai-
lers.that.offer.this.service.
Recycling. prevents. potential. dama-
ORANGE.LIGHT.ON
AQUA 25-35 INOX ErP LN
Once.it.reaches.the.end.
of. its. operating. life,. the.
equipment. MUST. BE.
RECYCLED. in. line. with.
current. legislation.. IT.
MUST. NOT. be. disposed.
2
bar
1
0
ge. to. the. environment. and. health..
It. allows. to. recover. a. number. of.
recyclable. materials,. with. conside-
rable.savings.in.terms.of.money.and.
energy.
3
4
60
Fig..24