New Construction Installation
A2
A1
D
Remove tape.
Remove the motor/blower from the housing.
A3
A4
Remove packing material.
Remove the pre-loaded screw tip covers.
A5
A6
E
Back out the pre-loaded screw tips until flush with the side
Remove the wiring cover screw.
of the housing.
4
41717-01 02/16/2008
41717-EngS_2-16-08_Arial.indd 4
2/16/08 3:51:17 PM