Descargar Imprimir esta página

Sungrow SH5.0RT Guía De Instalación Rápida página 38

Ocultar thumbs Ver también para SH5.0RT:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
6
COM (Meter, RS485, BMS/CAN, DO)
Label
(1)
Meter (A2, B2)
(1) (2)
RS485 (A1, B1)
BMS/CAN
Enable
DI/DRM
DO
(1) When the inverter is connected to a third-party monitoring device, please confirm which communication
interface is used, and whether it will cause loss of certain functions of the inverter.
(2) When RS485 (A1, B1) is used for parallel connection in the master inverter, the LG Chem battery (that uses
RS485 for communication) cannot be used with the master inverter. It can still be used with the slave inverter.
Take Smart Energy Meter connection as an example.
1
0.5...1mm
ø5.3...7mm
A
A: 40...50mm
B: 7...10mm
7
2
3
* For Li-on battery from LG
2
2
B
1
BMS/CAN
Meter
A2
B2
H
A1
B1
EN_H
RS485
Enable
Description
For Smart Energy Meter
For the inverter daisy chain (Slave inverter)
For the LG battery connection
For the EV-Charger
For the inverter daisy chain (Master inverter)
* For Italy: remote shutdown
For battery communication
"AU"/"NZ": Demand response enabling device (DRED)
"IT": Interface protection system (SPI)
"DE": Ripple Control Receiver (RCR)
For home load, e.g. SG Ready Heat Pump
For alarm warning, e.g. light indicator and/or buzzer
37
DI/DRM
D1/5
D3/7 R
L
D2/6 D4/8
C
EN_G
3
DO
NO
COM

Publicidad

loading