Descargar Imprimir esta página

Hilti PLT 400 Manual De Instrucciones página 28

Ocultar thumbs Ver también para PLT 400:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 60
Charging time
External data terminal
Bluetooth version
Bluetooth frequency range
WLAN standard
4.8
Battery
Battery operating voltage
Ambient temperature for operation
Storage temperature
Battery charging starting temperature
5
Preparations at the workplace
WARNING
Risk of injury by inadvertent starting!
▶ Before inserting the battery, make sure that the product is switched off.
▶ Remove the battery before making any adjustments to the power tool or before changing accessories.
Observe the safety instructions and warnings in this documentation and on the product.
5.1
Charging the battery
1. Before charging the battery, read the operating instructions for the charger.
2. Make sure that the contacts on the battery and the contacts on the charger are clean and dry.
3. Use an approved charger to charge the battery. → page 20
5.2
Inserting the battery
WARNING
Risk of injury by short circuit or falling battery!
▶ Before inserting the battery, make sure that the contacts on the battery and the contacts on the product
are free of foreign matter.
▶ Make sure that the battery always engages correctly.
1. Charge the battery fully before using it for the first time.
2. Push the battery into the product until it engages with an audible click.
3. Check that the battery is seated securely.
5.3
Removing the battery
1. Press the battery release button.
2. Remove the battery from the product.
5.4
Switching PLT 400 and PLC tablet on
1. Switch the PLT 400 and the PLC tablet on.
2. Start the PROFIS Layout Field application on the PLC tablet.
3. Comply with the notifications and instructions that appear on the display of the PLC tablet.
22
English
4 h
USB 3.0
4.0
2,400 MHz ... 2,483.5 MHz
IEEE 802.11a/b/g/n
21.6 V
−17 ℃ ... 60 ℃
(1 ℉ ... 140 ℉)
−20 ℃ ... 40 ℃
(−4 ℉ ... 104 ℉)
−10 ℃ ... 45 ℃
(14 ℉ ... 113 ℉)
2325080
*2325080*

Publicidad

loading