Descargar Imprimir esta página

Airzone Easyzone Serie Guía Rápida página 14

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
Checking the Installation
EN
Check the following items:
1.
Status of the main control board LEDs and of the other control elements connected.
Consult the Self-diagnostics section on each element's technical fact sheet.
2.
The main control board LEDs indicating the opening of motorized elements light up in
sequence.
3.
Power supply to wired and wireless thermostats.
12
Blinking
Steady
Switches
A (M1 ... M6)
A (M1 ... M6)
(Green) Damper
opening
(Red) Damper
closing

Publicidad

loading