Descargar Imprimir esta página

Acuva ArrowMAX HOME Manual De Usuario página 14

Sistema de tratamiento de agua para toda la casa

Publicidad

Idiomas disponibles

Idiomas disponibles

6. INSTALLATION GUIDE
(CONT.)
6.3 Installation Steps
2) Mounting the Control Display
The control display shall be mounted using the provided mounting system either
above or beside the chamber as illustrated in Figure 5.
a. Attach the display mount parts together.
b. Screw the display mount to the wall, above the chamber using the provided
screws.
Note: It is recommended to use anchors to fully secure the display mount on the wall.
Ideally, place the controller above the chamber and away from any water
connection point, to prevent any water from potentially leaking onto the
controller using a leak at a connection point or a "sweating" system.
c. Mount the Acuva control display onto the display holder.
a.
Figure 5: Mounting the Control Display
3) Flow Sensor Installation
As illustrated in Figure 6, install the flow sensor at the
outlet of the reactor. It can be connected directly to the
reactor or can be installed inline with the piping after
the reactor.
Note: Use pink thread sealant tape, color-coded for water lines
to connect the flow sensor, and apply the pipe thread sealant
to ensure sealing.
Note: Ensure the flow sensor direction is aligned with the flow
direction. Use the arrow sign on the flow sensor to identify the
direction.
14
(CONT.)
b.
c.
Figure 6: Flow Sensor

Publicidad

loading