Change Full Head - Blocks PRO 30 Manual De Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

02

Change Full Head

If the machine is loaded with filament , before starting the Head Change procedure, per-
form task 3.1 (Unload filaments).
(See page 32, task 3.1 Unload filament)
02.1
Remove tube and off chips
Attention: Perform this procedure with the machine off.
2.1.1. Remove the filament tube.
(See page 33, task 3.2 and 3.3 to Remove the tube)
2.1.2. Disconnect the 4 plugs marked in the figure below. (hotend, thermistor and fans).
02.2
Remove cap screws
2.2.1. Using a 1.8mm hexagon key remove the two (2) screws securing the cover.
PRO 30
29
MANUAL DE MANUTENÇÃO

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido