Descargar Imprimir esta página

Heatscope PURE+NEXT Manual De Instrucciones E Instalación Original página 7

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 18
may only be replaced by a professional servicing company enlisted by the manufacturer.
The supply cable must be connected generally in a commercially available wet room
distribution box with IP65 protection class acc. to IEC or UL / CSA (not within the scope of
supply).
3.
The HEATSCOPE
®
rating.
4.
As soon as the unit is connected to a power source and switched on using an „ON/OFF"
reaches its operating temperature.
front or the entire front of the radiant heater. Do not touch any part of the HEATSCOPE
face of the HEATSCOPE
ble soft materials.
contact with the surface of the radiant heater and never cover the unit. Under no cir-
cumstances should the unit be covered or enclosed with insulating or similar materials.
beams and rafters must not be cut into or grooved to install the infrared heater. When
installing the HEATSCOPE
in this manual are maintained. Always maintain a distance from the heating surface of
the HEATSCOPE
®
materials.
angle or removing it from the wall/ceiling. Wait until the heating elements are not glowing
the power using an omnipolar switch.
9.
The HEATSCOPE
®
manually using an selector switch on the unit itself. The unit must be connected to a
residual current circuit breaker and a fuse on the installation side.
the existing electrical installation acc. to the facility regulations. The heater comes as
standard with a separate open-ended cable for connection purposes.
is protected against splashing water and has an IP65 protection class
®
®
features an omnipolar „ON/OFF" switch. The unit can be controlled
A M B I E N T H E A T I N G S O L U T I O N S
®
EN
®
. Covering
-
-

Publicidad

loading

Productos relacionados para Heatscope PURE+NEXT