Descargar Imprimir esta página

Selco WFR 1000 SYNCRO Instrucciones De Uso página 17

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 35
3 SYSTEM PRESENTATION
3.1 Control panel
1
Wire feed
Allows the manual wire feed without gas flow and with-
out the wire live.
Allows the insertion of the wire into the torch sheath
during the welding preparation phases.
3.2 Front panel
1
Wire outlet
2
Signal cable input
3.3 Rear panel
3
Wire input
4 MAINTENANCE
Routine maintenance must be carried out on the
system according to the manufacturer's instruc-
tions.
Any maintenance operation must be performed by qualified
personnel only.
When the equipment is working, all the access and operating
doors and covers must be closed and locked.
Unauthorized changes to the system are strictly forbidden.
Disconnect the power supply before every opera-
tion!
Carry out the following periodic checks on the
power source:
- Check the electric connections and all the con-
nection cables.
For the maintenance or replacement of torch components,
electrode holders and/or earth cables:
Check the temperature of the component and
make sure that they are not overheated.
Always use gloves in compliance with the safety
standards.
Use suitable wrenches and tools.
Failure to carry out the above maintenance will invalidate all
warranties and exempt the manufacturer from any liability.
17

Publicidad

loading