Descargar Imprimir esta página

Magneti Marelli M-MX4000 Manual De Operación página 11

Ocultar thumbs Ver también para M-MX4000:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 24
Verify the following:
· Outer enclosure and hand grip parts are undamaged.
· The power cord plug is undamaged (i.e. not cracked or charred, and without deformed contacts).
· The power cable is protected against ripping out of the plug or the machine and its insulation is undamaged.
- the electrical lines and connections in the ozone generator are good.
2. Protective earth line check
Verify the following:
· The PE wire is firmly and properly connected.
· The length of the power cable live and return wire allows them to be strained before straining the PE wire when
the cable leaves the cable relief hook.
4. Measurements
· Measure the insulation resistance with the machine and its power cable cold. Test with a continuous voltage of
500 V (from a 500 V megohmmeter). The insulation resistance values shall not be less than:
2 MΩ for Protection Class I and III equipment;
7 MΩ for Protection Class II equipment.
· The maximum permissible resistance of the PE wire is 0.1 Ω.
· The measurement results are positive when:
Rp ≤ Rw and RPE ≤ RPR, with:
Rp - measured insulation resistance
Rw - maximum permissible insulation resistance
Rpe - maximum permissible wire resistance
Rrr-w - maximum permissible PE wire resistance
Ozone generator testing intervals:
Cat. I: 6 months (infrequent operation per month)
Cat. II: 4 months (frequent operation, 1 to 3 times a day)
Cat. III: 2 months (continuous operation on several work shifts)
Categories defined in PN-88/E-08400/10: Handheld electrical power tools: Inspection tests during the operating
life.
Note: Reduce the given testing intervals by half if the ozone generator is operated at elevated risk of mechanical
damage, in damp rooms, extreme conditions, etc.

Publicidad

loading

Productos relacionados para Magneti Marelli M-MX4000