4
5
6
10
English
Measure the distance from the front of the plaster
shield to one of the screw-in flanges ("X").
Add ½" to this measurement.
Cut each screw so that it is X + ½" long.
Install the carrier plate so that the notch is at the
bottom.
Install the carrier plate screws.
Open the stops.