Descargar Imprimir esta página

Pentair BIOSHIELD PRO Guía De Instalación Y Usuario página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

SECTION 3: INSTALLATION
Vertical Installation
Vertical installation requires the bottom port to be
used as the vessel's inlet and the port closest to the
electrical end to be used as the outlet; allowing trapped
air to escape. If installed on a "by-pass filter loop" or
isolated using valves, an automatic air bleed system is
required. Failure to remove trapped air can result in
rupture or heat damage to the vessel.
4. Isolation Valves are necessary for vessel removal and
chemical cleaning procedure. It is recommended
to install the isolation valves in conjunction with a
separate set of, matching size & type, water port
connections to the inlet/outlet ports of the vessel.
Adding the "double connection" will enable the UV
system to be removed from the filtration loop without
shutting the total filtration system down. If this
installation arrangement is not possible, install the
unit in a way that chemical cleaners or freshwater
rinse can be drained completely from the vessel
without contaminating the process water.
5. The vessel is equipped with a 0.5" female threaded
drain port for installation of the Drain Valve Assembly.
Use thread tape on the threads when installing the
drain valve assembly.
BioShield® PRO UV System Installation and User's Guide
9

Publicidad

loading