Descargar Imprimir esta página

Emerson FLORET ECO Manual Del Usuario página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Ceiling Fan Assembly
3.7
Carefully turn the partially assembled Ceiling Fan right
side up for preparation of remaining assembly.
NOTE: Be Extra Careful of the Unassembled Fan
Blades while turning the Fan Upright.
Secure the Fan Blades at this time. Install and
tighten the remaining #8-32 x 1/2" Washer Head
Blade Screws (supplied), 2 Screws per Blade
(Figure 7).
A spare #8-32 x 1/2" Washer Head Blade Screw is
supplied in the parts bag, if needed.
3.8
Remove the Hanger Ball by loosening the Phillips Head
Set Screw in the Hanger Ball until the Ball falls freely
down the 4.5" Downrod (Figure 8).
Remove the Pin from the Downrod, then remove the
Hanger Ball (Figure 8).
Retain the Pin and Hanger Ball for reinstallation in
Step 3.12.
Note: Do not loosen the screw that attaches the
green ground wire to the hanger ball.
3.9
Separate, untwist and unkink the Five 80" Motor Wires.
Route the Five 80" Motor Wires through the Downrod
(Figure 9).
(Continued)
Figure 7
PIN
PHILLIPS HEAD SET SCREW
(LOOSENED)
Figure 8
Figure 9
8
8
#8-32 x 1/2" WASHER HEAD
BLADE SCREWS
(2 per blade)
GREEN GROUND WIRE
4.5" DOWNROD
HANGER BALL
80" FAN MOTOR
WIRES (5)
DOWNROD
ETL Model No.: CF840

Publicidad

loading

Este manual también es adecuado para:

Cf840bq00Cf840orb00Cf840grt00Cf840sw00