Descargar Imprimir esta página

Kohler K-153 Manual De Instrucciones página 10

Ocultar thumbs Ver también para K-153:

Publicidad

Idiomas disponibles

Idiomas disponibles

Supply
Tube
8. Supply Connections
Install the lavatory using the lavatory manufacturer's instructions.
Connect the supply tubes to the handle valves, and the supply
stops. Left is hot and right is cold.
Tighten all connections.
9. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Remove the aerator by turning it counterclockwise.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves
off.
Remove any debris from the aerator and reinstall.
112470-2-BD
Supply
Tube
10
Kohler Co.

Publicidad

loading