Descargar Imprimir esta página

GE JVM1600 Serie Instrucciones De Instalación página 19

Ocultar thumbs Ver también para JVM1600 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

C
RECIRCULATING
INSTALLATION OVERVIEW
C1. Attach Mounting Plate to Wall
C2. Prepare Top Cabinet
C3. Adjust Blower
C4. Mount the Oven
C5. Install Charcoal Filter
C1.
ATTACH THE MOUNTING
PLATE TO THE WALL
Attach the plate to the wall using toggle bolts. At
least one wood screw must be used to attach the
plate to a wall stud.
1
Remove the toggle wings from the bolts.
2
Insert the bolts into the mounting plate through
the holes designated to go into drywall and
reattach the toggle wings to
To use toggle bolts:
Spacing for Toggles
More Than Wall
Thickness
Toggle Wings
Mounting
Toggle
Plate
Bolt
Wall
Installation Instructions
(Non-Vented Ductless)
" onto each bolt.
3
4
Bolt End
3
Place the mounting plate against the wall and
insert the toggle wings into the holes in the wall to
mount the plate.
NOTE: Before tightening toggle bolts and wood
screw, make sure the tabs on the mounting plate
touch the bottom of the cabinet when pushed flush
against the wall and that the plate is properly
centered under the cabinet.
CAUTION: Be careful to avoid pinching fingers
between the back of the mounting plate and the wall.
Tighten all bolts. Pull the plate away from the wall
4
to help tighten the bolts.
C2.
USE TOP CABINET TEMPLATE
FOR PREPARATION OF TOP
CABINET
You need to drill holes for the top support screws and
a hole large enough for the power cord to fit through.
Read the instructions on the TOP CABINET
TEMPLATE.
Tape it underneath the top cabinet.
Drill the holes, following the instructions on the
TOP CABINET TEMPLATE.
CAUTION: Wear safety goggles when drilling holes
in the cabinet bottom.
19

Publicidad

loading