Descargar Imprimir esta página

GE JVM1600 Serie Instrucciones De Instalación página 18

Ocultar thumbs Ver también para JVM1600 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

B6.
MOUNT THE OVEN
FOR EASIER INSTALLATION AND PERSONAL
SAFETY, WE RECOMMEND THAT TWO PEOPLE
INSTALL THIS OVEN.
IMPORTANT: Do not grip or use handle
during installation.
NOTE: If your cabinet is metal, use the nylon
grommet around the power cord hole to prevent
cutting of the cord.
NOTE: We recommend using filler blocks if the
cabinet front hangs below the cabinet bottom shelf.
IMPORTANT: If filler blocks are not
used, case damage may occur from over
tightening screws.
NOTE: When mounting
the oven, thread power
cord through hole in
bottom of top cabinet.
Keep it tight throughout
Steps 1–3. Do not pinch
cord or lift oven by
pulling cord.
2 Rotate front of oven up
against cabinet bottom.
Installation Instructions
1
Lift oven, tilt it
forward and hook
slots at back bottom
edge onto two lower
tabs of mounting plate.
Cabinet Front
3
Attach the oven to the top cabinet by inserting
3 self-aligning screws through outer top cabinet
holes. Turn two full turns on each screw. Be sure
to keep power cord tight. Be careful not to pinch
the cord, especially when mounting flush to
bottom of cabinet.
4
Tighten the three screws to the top of the oven
completely. (While tightening screws, hold the
oven in place against the wall and the top
cabinet.)
5
Install grease filters. See the Owner's Manual
packed with the oven.
18
Cabinet Bottom Shelf
Filler Block
Equivalent
to Depth
of Cabinet
Recess
Self-Aligning Screw
Oven Top

Publicidad

loading