Descargar Imprimir esta página

Kohler K-T10184 Guia De Instalacion página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Install the Trim (cont.)
Thread the handle assembly onto the hub of the front plate
assembly to secure the escutcheon in place. The handle will be in
the closed, vertical 6 o'clock position.
NOTE: If the handle does not engage the valve or the escutcheon
does not tighten to the wall, replace the valve stem adapter with an
adapter of appropriate length.
1041505-2-J
6
Kohler Co.

Publicidad

loading