Descargar Imprimir esta página

Mato Lube Shuttle Accu-Greaser 18V - LS Instrucciones De Empleo página 11

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 18
Operating manual
Accu Greaser 18V-LS
4
Set up
- Before first use, the battery must be charged.
For further use a charging time of approximately
1 hour suffices.
- Before charging ensure that the mains voltage
matches the specifications on the nameplate
of the charger.
- To charge the battery, remove from the handle of
the device and place in the charger.
- The charging process is started automatically.
- The red diode ON indicates that the battery
is being charged.
- The green diode OFF indicates that
charging has finished.
- Filling with grease cartridges:
Only use standard (DIN 1284) 400g grease
cartridges.
- Filling with fill-device:
- Only use 400g Lube Shuttle System grease
cartridges.
- Open grease cartridge and push the grease forwards
by means of the sequence piston of the cartridge
until it is flush with the thread opening.
- Insert cartridge into the grease gun barrel and screw tightly.
- The grease gun is now operational.
- Press the START button until grease emerges from the
nozzle.
- The green operating LED lights up during normal operation
As long as the START switch is pressed.
- If the max. Operating pressure 400 bar the electronic overload
limiter of the device switches Prevents the motor from overloading.
In this case, the green operation LED does not light even if the
START switch is pressed.
Break off the lubrication process and establish the reason for the high
pressure build-up. It could, for example, be that the lubrication nipple,
the lubrication line or the depository is damaged or clogged.
The current battery capacity can be recalled by the red BAT button.
The function of the button is only possible during operation.
- The temperature of the battery raises during use.
Before recharging the battery, leave to cool to room temperature,
otherwise it will not charge.
5
Maintenance and care:
The high-performance battery grease gun works maintenance free.
Regularly check the pressure-bearing components (high pressure hose) and the current-carrying
components (charger) for any damage or wear.
Defective parts must be replaced immediately with genuine parts.
Store Li-ion battery only in a fully charged state for a long time.
Do not sharply bend high-pressure hose, regularly check for physically visible damage.
It is recommended to replace item after 3 years by genuine spare part.
MATO
GmbH & Co. KG
/ Benzstr. 16-24 / 63165 Mühlheim a. Main / Tel:+49(0)6108-906-0 / Fax:+49(0)6108-906-120
Hydraulic nozzle
G1/8"
Plug
screw
Tube
400g Lube-Shuttle
Grease cartridge
Operating-
LED
High pressure
hose
START
switch
18V Battery
Battery capacity-
Indicator
BAT-button
11

Publicidad

loading