Descargar Imprimir esta página

Truper SOT-250AL Instructivo página 19

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Connections
CAUTION
To prevent electric shock it is necessary
to see information and diagrams in the "Power
Requirements" section in page 3.
• Connect the welding machine to ground (A) as indicated
in page 3.
• Connect the electrode holder to the corresponding bolt
(B) in the welding machine.
• Hold the electrode suitable to the job (C) with the
electrode holder.
• Connect the connection to the work piece to the
corresponding bolt (D) in the welder machine.
• Connect the other end to the table or work piece (E).
• Connect the welding machine to the power source (F) as
shown in page 3.
• If the connectors are not tightened
CAUTION
properly, the internal connection dashboard and the
welding cable may get burned. Double-check all the
connections before starting the welding machine.
C
E
For best results use original parts such as:
- Electrodes (E6013-3, E6013-4, E7018-4, E6011-4)
Truper
brand
®
- Cables with ground clamp set (CAB-300P)
Pretul
brand
®
F
A
B
D
7
ENGLISH

Publicidad

loading

Este manual también es adecuado para:

13106