12. Press [ENTER] to edit the time needed, the display shows "Nt-X", "N" stands for the scenes no., value
"1-F", "X" stands for the time needed to run in this scene, value "1-F". For example, "1t-2" means you need 2
seconds to run on scene 1, " 5t-F" means you need 15 seconds to run on the 5
13. Adjust the desired time by pressing [UP].
14. Press [ENTER] to save the settings for the scene you are editing, the display will change to the next
scene automatic .
15. repeat step 3-14 to edit and other scenes, you can edit and save 15 (F) scenes maximum.
16. Press [EXIT/DN] to exit. The number of steps can be defined under "CONT" and the scenes can be
called up under "RUN"
b) Editing via the external controller
Please note: when editing via the external controller, the individual scenes are not displayed by the
projector. This is why it is necessary to program all desired scenes in the DMX-mode with the connected
controller and to save the scenes in the controller before you start the Download.
1. Call up the first scene in your controller now.
2. Press [ENTER] for 3 seconds to enter the main menu (display flashing).
3. Select "EDIT" by pressing [UP] button.
4. Press [ENTER], the display shows "SCE1".
5. Press [ENTER], the display shows "Par1".
6. Select "CNIN" by pressing [UP].
7. Press [ENTER], the display shows "OFF".
8. Press [UP], the display shows "ON".
9. Press [ENTER], the display shows "SCE2". You successfully downloaded the first scene.
10. Adjust the Step-time as described above under point 12.
11. Call up the second scene in your controller now.
12. Repeat steps 5-11 until all desired scenes are downloaded.
13. Press [EXIT/DN] to exit. The number of steps can be defined under "CONT" and the scenes can be
called up under "RUN"
CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) Mechanically moved parts like axles, eyes and others must not show any traces of wearing (e.g. material
abrading or damages) and must not rotate with unbalances.
4) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
Disconnect from mains before starting maintenance operation!
We recommend a frequent cleaning of the device. Please use a moist, lint-free cloth. Never use alcohol or
solvents!
The lens has to be replaced when it is obviously damaged,
so that its function is impaired, e. g. due to cracks or deep scratches!
All manuals and user guides at all-guides.com
DANGER TO LIFE!
CAUTION!
37/75
th
scene.
51838165X87NXS_V_1_1.DOC