Descargar Imprimir esta página

OVE BREEZE 32 Serie Manual De Instalación página 26

Ducha de esquina

Publicidad

Idiomas disponibles

Idiomas disponibles

B
1
1.1. Measure the location of the existing shower valve and shower arm fitting in the wall, as illustrated by the measures W1, W2, W3 and W4 below.
1.2. Before installing your drywalls, drill holes at the measured locations for the existing plumbing on the wall. Use a hole saw drill bit to neatly cut through the
drywall. Also cut the drywalls the to correct height.
The studs, the drywalls and the drywall
screws are not supplied.
Drywall
BASE INSTALLATION (DRYWALLS)
NOT SUPPLIED!
1.2
1.1
HELPFUL HINT!
A hole saw drill bit of the proper size
can be rented at your local tool renting
store.
P. 26

Publicidad

loading

Este manual también es adecuado para:

Breeze 34 serieBreeze 36 serieBreeze 38 serie