Calibration Procedure - Toto TSST Manual De Instrucciones Y Del Propietario

Válvula de mexcla termostatica 1/2 (13mm)
Ocultar thumbs Ver también para TSST:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

After the valve is calibrated, the limiter provides 108ºF (42ºC) at the first
stop position and prevents the temperature from exceeding 120ºF (49ºC) at
the final stop position�
Perform this calibration procedure when you are ready to install the trims�
NOTE: These illustra-
tions show the valve
after installation and
finishing of the wall�
V-Groove
Trim Adapter
Valve Stem

CALIBRATION PROCEDURE

Service
Stop
1) Shut off the hot and cold water supply at
the service stops�
2) Remove the trim adapter� Check to
make sure the v-groove of the limiter
aligns with the v-groove of the main unit�
If it is not aligned, slide the limiter out
and re-install, making sure to align the
two grooves�
3) Re-install the nut�
4) Turn on the water supply at the service
stops�
5) Turn the water on and let run for about
1 minute� Place a thermometer in the
water stream�
6) Slowly turn the mixing valve stem until
the water temperature is at a constant
104ºF (40ºC)�
No t e: After the water temperature is set
at 104ºF (40ºC), do not turn the valve
stem until you have installed the handle
trim� If the valve is turned accidentally,
you will need to repeat the calibration
procedure�
7) Install the handle trim as instructed in
the trim manual�
5

Publicidad

Tabla de contenido
loading

Tabla de contenido