Descargar Imprimir esta página

OVE SIDNEY 32 Instrucciones De Instalación página 11

Panel lateral

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Place side panel's vertical seal strip (Q) to the side panel (O).
2. Place the side panel onto the clamp (R).
3. Install the support bar's anchors (N), support bar (D) and the stoppers (M) together.
4. Install the support bar to the side panel (O), using screw (OO), fitting (PP & QQ & RR) and cap (SS).
5. Install the fixer (P) to the side panel (O), using screws (DD).
6-7. Mark the positions of the fixer (P) and the clamp (R).
8-9. Remove the fixer (P) and the clamp (R).
10. Place the clamp (R) back to it's position without the plastic gasket, mark the holes.
7
R
SIDE PANEL INSTALLATION
8
1
O
Q
3
D
M
N
5
P
DD
9
R
11
2
O
R
4
PP
OO
RR
QQ
SS
6
10
R

Publicidad

loading