Descargar Imprimir esta página

Mitsubishi Electric Mr.Slim SEZ-M25 Manual De Instalación página 15

Ocultar thumbs Ver también para Mr.Slim SEZ-M25:

Publicidad

6. Refrigerant piping work
1. Remove and discard the rubber bung which is inserted in the end of the unit
piping.
2. Flare the end of the site refrigerant piping.
3. Pull out the thermal insulation on the site refrigerant piping and replace the
insulation in its original position.
Cautions On Refrigerant Piping
▶ Be sure to use non-oxidative brazing for brazing to ensure that no foreign
matter or moisture enter into the pipe.
▶ Be sure to apply refrigerating machine oil over the flare connection
seating surface and tighten the connection using a double spanner.
▶ Provide a metal brace to support the refrigerant pipe so that no load is
imparted to the indoor unit end pipe. This metal brace should be provided
50 cm away from the indoor unit's flare connection.
6.4. Purging procedures leak test
PURGING PROCEDURES
Connect the refrigerant pipes (both the liquid and gas pipes) between the indoor
and the outdoor units.
Remove the service port cap of the stop valve on the side of the outdoor unit gas pipe.
(The stop valve will not work in its initial state fresh out of the factory (totally closed
with cap on).)
Connect the gage manifold valve and the vacuum pump to the service port of the
stop valve on the gas pipe side of the outdoor unit.
Run the vacuum pump. (Vacuumize for more than 15 minutes.)
Check the vacuum with the gage manifold valve, then close the gage manifold
valve, and stop the vacuum pump.
Leave it as is for one or two minutes. Make sure the pointer of the gage manifold
valve remains in the same position. Confirm that the pressure gage show
-0.101MPa (-760 mmHg).
Stop valve
*Close
Stop valve
*Open
Hexagonal wrench
Service port
*4 to 5 turns
Remove the gage manifold valve quickly from the service port of the stop valve.
After refrigerant pipes are connected and evacuated, fully open all stop valves on
gas and liquid pipe sides.
Operating without fully opening lowers the performance and causes trouble.
7. Duct work
• When connecting ducts, insert a canvas duct between the main body and the duct.
• Use non-combustible duct components.
Caution:
• The noise from the intake will increase dramatically if intake Ⓐ is fitted
directly beneath the main body. Intake Ⓐ should therefore be installed as
far away from the main body as possible.
Particular care is required when using it with bottom inlet specifications.
• Install sufficient thermal insulation to prevent condensation forming on
outlet duct flanges and outlet ducts.
• To connect the air conditioner main body and the duct for potential
equalization.
• To reduce the risk of injury from metal sheet edges, wear protective gloves.
• To avoid electrical noise interference, do not run transmission lines at the
bottom of the unit.
Compound pressure
-0.101MPa
gauge (for R32/R410A)
(-760 mmHg)
Pressure gauge
(for R32/R410A)
Gauge manifold valve
(for R32/R410A)
Handle High
Handle
Low
Charge hose
Stop
(for R32/R410A)
valve
(or the vacuum
Vacuum
pump
pump with the
Window
function to
Adapter for
prevent the
Charge hose
preventing
back flow)
(for R32/R410A)
the back flow
Pipe length :
7 m maximum
No gas charge is needed.
Tighten the cap to the service port to obtain the initial status.
Retighten the cap
6.5. Drain piping work
[Fig. 6-10] (P.4)
Ⓐ Downward slope 1/100 or more
Ⓑ Connection dia. R1 external thread
Ⓒ Indoor unit
Ⓓ Collective piping
Ⓔ Maximize this length to approx. 10 cm
• Ensure that the drain piping is downward (pitch of more than 1/100) to the
outdoor (discharge) side. Do not provide any trap or irregularity on the way. (①)
• Ensure that any cross-wise drain piping is less than 20 m (excluding the
difference of elevation). If the drain piping is long, provide metal braces to prevent
it from waving. Never provide any air vent pipe. Otherwise drain may be ejected.
• Use a hard vinyl chloride pipe O.D. ø32 for drain piping.
• Ensure that collected pipes are 10 cm lower than the unit body's drain port as
shown in ②.
• Do not provide any odor trap at the drain discharge port.
• Put the end of the drain piping in a position where no odor is generated.
• Do not put the end of the drain piping in any drain where ionic gases are
generated.
[Fig. 6-11] (P.4)
Ⓐ Indoor unit
Ⓑ Pipe cover (short) (accessory)
Ⓒ Tie band (accessory)
Ⓓ Band fixing part
Ⓔ Insertion margin
Ⓕ Drain hose (accessory)
Ⓖ Drain pipe (O.D. ø32 PVC TUBE, field supply)
Ⓗ Insulating material (field supply)
Ⓘ Max.145 ± 5 mm
1. Insert the drain hose (accessory) into the drain port.
(The drain hose must not be bent more than 45° to prevent the hose from
breaking or clogging.)
The connecting part between the indoor unit and the drain hose may be
disconnected at the maintenance. Fix the part with the accessory band, not be
adhered.
2. Attach the drain pipe (O.D. ø32 PVC TUBE, field supply).
(Attach the pipe with glue for the hard vinyl chloride pipe, and fix it with the band
(small, accessory).)
3. Perform insulation work on the drain pipe (O.D. ø32 PVC TUBE) and on the
socket (including elbow).
• Keep the distance between the inlet grille and the fan over 850 mm.
If it is less than 850 mm, install a safety guard not to touch the fan.
[Fig. 7-1] (P.5)
Ⓐ Air inlet
Ⓑ Air outlet
Ⓒ Access door
Ⓓ Ceiling surface
Ⓔ Canvas duct
Ⓕ Air filter
Ⓖ Inlet grille
Pipe length exceeding 7 m
Charge the prescribed
amount of gas.
Leak test
15

Publicidad

loading