Descargar Imprimir esta página

Pentair MYERS HR Serie Instalación/Operación página 11

Ocultar thumbs Ver también para MYERS HR Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Fuse box or Circuit breaker
Copper electric wire with ground
1-1/4" PVC Adapter
Packer Well Adapter bolted
directly to pump
Figure 5 - Typical Deep Well Packer Installation
1-1/4" PVC Adapter
1" x 4" Nipple
Step 8A
1-1/4" rigid PVC Pipe
1" PVC Adapter
2" Packer Well Adapter
Step 7
2" Packer Well Adapter
Pressure Gauge
(Purchase separately)
Pressure Regulator
Step 8
1-1/4" rigid PVC Pipe
3-1/2"
1" female PVC Adapter
1" rigid PVC Pipe
1" PVC Adapter
1-1/4" to 1" Bushing
2" Packer Well Adapter
1" x 8" Nipple
1" female PVC Adapter
Step 5
1" rigid PVC Pipe
1" PVC Adapter
Venturi
Nozzle
Packer Ejector
1" Foot Valve
6721 1112
11
Step 6
Step 4
Step 3
Step 2
Step 1

Publicidad

loading

Este manual también es adecuado para:

Myers hj serieMyers hr50s