SMART MIG 350 MPV1
5. INSTALATION AND OPERATION.
Notice: Please install the machine strictly according to the following steps.
Turn off the power supply before any electric connection operation.
IP21S enclosure protection grade, please do not operate it in rain.
5.1. MMA
5.1.1. Installation
1.
Please connect the primary power line to the according voltage class. Please make sure the power line is
connected to the right voltage class.
2.
Please make sure the primary source is in fine contact with the according power line terminal or socket and
prevent oxidation.
3.
Please measure the voltage with multi-meter and check if it's in the fluctuation range.
4.
Please insert the earth clamp cable plug into the front panel's below position "+" socket, and screw tightly
clockwise.
5.
Please insert the electrode holder cable plug into the front panel's upper position"-"socket and screw tightly
clockwise.
6.
Please make sure the supply is in good earthing condition.
5.1.2. Sketch map of installation
Gala Gar, S.L. c/ Jaime Ferrán, 19 (Políg. Cogullada) | Tel.: (+34) 976 47 34 10 - 50014 ZARAGOZA |
25/69
www.galagar.com