Descargar Imprimir esta página

Haier MVAH072ME2AA1 Manual De Instalación página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
Installation space and method
Body installation:
1.Use 3/8" (M10) lifting bolts.
2. Ceiling removal: For different building structures, please consult with building personnel about actual conditions.
a. Ceiling reinforcement: Ensure the ceiling is horizontal and will not shake. The ceiling base frame must be reinforced.
b. Cut off and remove the ceiling base frame.
c. Reinforce the faces left when the ceiling is removed and further reinforce the base frame that fix both ends of the
ceiling.
d. After the unit installation is complete, it is time to install pipes and wires. Choose a suitable installation position
and determine the outgoing direction of pipes before installation. Please pull refrigerant tubing, drain hose, indoor
and outdoor connecting wires, control wires to their connection positions prior to hanging the machine when
a ceiling exists.
Installation space:
Level the unit within 0.2in(5mm)
Ensure the end having drainage port is slightly lower to facilitate drainage
Installation of air-inlet grille
The angle of air-inlet grille should be parallel with that of air inlet direction, otherwise it will cause more noise. Example
shown to the right.
Correct
31-5000553 Rev. 1
Electric Control
>40in
Enclosure
>24in
4-Ø3/8"(M10) hanging bolt
Air in
>4in
8-Ø3/8"(Ø10) washer
8-Ø3/8"(M10) hanging nut
Wrong
Air out
13

Publicidad

loading

Este manual también es adecuado para:

Mvah096me2aa1