Descargar Imprimir esta página

EDSAL Muscle Rack LR4747-SV Instrucciones De Montaje página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Parts List
A
B
ITEM
QTY
PART NO.
A
4
300-27
B
8
URAPTLL15
C
4
ZBS-47
D
1
ZTS-47.7
E
2
SRBTLL47
F
3
WD4715.7
Tools Required
Rubber Mallet
7/16" Open End
Safety Glasses
Installation Overview
Plan the installation.
Determine height and
install the vertical posts.
C
D
DESCRIPTION
Ceiling Bracket 27"
Vertical Post
Beam (double rivet)
Tie Support
Side Beam (single rivet)
Wire Decking
Magnetic Leveler
7/32" Drill Bit
Wrench
Determine rack
orientation.
Assemble and install perimeter
beams and tie support.
G
x8
H
Hex Head
Large
Lag Bolt
Washer
Tape Measure
Stud Finder
Cordless Power
Drill
E
F
HARDWARE
I
x8
x20
Flange Hex
Locknut
Bolt
Pencil
Gloves
3/8" Socket and
1/2" Socket
Install ceiling brackets.
Install wire decking.
K
J
x8
x20
Small
Hex
Washer
Ladder

Publicidad

loading

Productos relacionados para EDSAL Muscle Rack LR4747-SV