Assembly Instructions
Step 3
- Assemble Vertical Posts (B)
Determine desired height of ceiling rack from the ceiling to bottom of the overhead rack. Make sure you allow
for enough clearance for doors, vehicles and other objects below the rack when determining the height. Join two
Vertical Posts (B) and line up the holes at the desired height (must have minimum of two overlapped hole positions).
Bolt together using two Flange Hex Bolts (I) and two Hex Locknuts (J) at the highest hole position and the opposite
side lowest hole position of the two overlapped posts (see illustration). Repeat assembly for the remaining Vertical
Posts (B) at the same height.
B
B
Step 4
- Install Vertical Posts assemblies to Ceiling Brackets
Bolt the vertical post assemblies on the inside of each installed ceiling bracket through the same hole position using
one Flange Hex Bolt (I) and one Hex Locknut (J) per install.
✓
Note: Must be bolted at the
highest point and lowest point
of the two overlapped vertical
posts at opposite sides.
Note: Install all vertical post
assemblies with the open
angle facing inside.
✓
✓