Descargar Imprimir esta página

spalina BT-65105 Instrucciones página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation of side panels
Handle with care during installation so as to avoid scratches.
Connect the draining switch with the draining pipe, and a soft pipe may be used in
case of a deviation between the drainage pipe and the ground hole.
Take down the screws, ornamental cover and plastic gaskets, then take out the side
panel.
Adjust screws of the foot stand to place the bathtub horizontally.
Fix the panel as shown in the diagram. Insert the side panel between the bathtub edge
track and the fixed plastic board, then fix it with screws.
OPERATION OF THE BATHTUB
Don't press the button 9 to start the bubble massage until the
water in the bathtub is higher than the backflow hole.
Press the button 8 to start or stop the water jet.
Turn the knob 7 to adjust the strength of the water jet (clockwise
for more strength, anti-clockwise for less strength).
Press the button 10 to control the lamps.
Don't use too hot water. Fill the bathtub with cold water before hot
water.
DRAINING
Adjust the screws of the bottom stands to ba-
lance the bathtub body.
Connect a drain pipe (not supplied) to the drain
hole of the bathtub then connect the pipe to a
drain hole in the ground. You may use some
glue, if necessary. Follow the below drawing for
operation.
CLEANING
• Disconnect the bathtub before cleaning.
• Clean with soft cloth and light detergent.
• Note: Do not use rough tool or sanded detergent with chemical dissolvent to clean the bathtub.
• If there is a scratch on the bathtub, polish lightly with a sandpaper, apply toothpaste and then clean with soft cloth.
• The lime scale or dirt on the surface can be cleaned with light acid detergent (such as lemon juice) or heated wax. Wipe with soft cloth in the end.
• Do not wipe the chromed parts too often.
• Don't strike or scratch the surface.
10
EN
10
9
Balance ruler
Drainage
8
7
Drainage pipe

Publicidad

loading