Descargar Imprimir esta página

LIVARNO home 898-S-2 Instrucciones De Uso Y De Seguridad página 53

Ocultar thumbs Ver también para 898-S-2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 32
Mounting the solar panel on the
spotlight
Screw the screw fixing
„ „
connecting sleeve
tighten it hand-tight.
Now fix the solar panel/spotlight bracket
„ „
in the guide holes
4
spotlight by pushing the guide rail
the bracket into the guide holes of the LED
solar spotlight until they lock into place.
Slot the solar panel
„ „
panel/spotlight bracket
Please note: to detach the bracket again,
very carefully press the tabs on the sides of
the guide rail
until the bracket can be
5
removed.
Now plug the power cable
„ „
charging socket
15
you must first remove the rubber cap.
Please note: the cap cannot be screwed on
in this position and hangs loosely on the
cable. This has no effect on the functioning
of the product.
Mounting the solar panel on a wall/
roof
Screw the solar panel screw fixing
the solar panel/spotlight bracket
the connecting sleeve
hand-tight.
Use the fixing holes
„ „
wall bracket
to mark the positions for
19
drilling the holes (see Fig. F).
Drill the holes (ø 5.5 mm, about 30 mm
„ „
deep).
Now insert the wall plugs
„ „
holes
20
Offer the wall bracket
„ „
mounting surface and fix it in place with
the screws
23
Now push the solar panel/spotlight bracket
„ „
onto the solar panel wall bracket
4
until it very lightly snaps into place.
Now connect the plug of cable
„ „
socket of the extension cable
D) and then connect the plug of cable
together with the
3
(see Fig. A) and
2
in the LED solar
10
of
5
onto the solar
1
4
into the
6
(see Fig. C); to do so
onto
3
using
4
and tighten it
2
in the solar panel
20
into the fixing
23
up to the
19
19
to the
6
(see Fig.
18
18
to the charging socket
spotlight.
Now align the LED solar spotlight as
„ „
desired.
Please note: to detach the bracket again,
very carefully press the tabs on the sides of
the guide rail
until the bracket can be
5
removed.
Mounting the solar panel on the ground
spike
Screw the solar panel screw fixing
„ „
the connecting sleeve
hand-tight.
Now join the LED solar spotlight
„ „
together with the ground spike
D) using the connecting sleeve
push the spike into the ground (lawn, soil,
etc.) where desired.
Please note: make sure the solar panel is
attached firmly!
Now connect the plug of cable
„ „
socket of the extension cable
D) and then connect the plug of cable
to the charging socket
spotlight.
The spotlight and solar panel are now ready
for use.
RISK OF INJURY! Make sure you remove
the ground spike when removing the
spotlight to avoid any risk of injury (e.g. trip
hazard).
z Charging the battery
The battery is charged regardless of the
„ „
position of the switch. To optimise initial
charging, charge the LED solar spotlight
while it is turned off.
Please note: the battery is fully charged after
it has been well exposed to sunlight for 6 to 8
hours. The duration of the charging process
depends on the battery's charge level and the
of the LED solar
15
onto
3
and tighten it
2
11
(see Fig.
17
and
2
to the
6
(see Fig.
18
18
of the LED solar
15
GB/IE/NI/CY/MT
53

Publicidad

loading

Este manual también es adecuado para:

898-w-2