To get the control unit, open the fascia lifting the cover and
loosening the screw (A).
Pass the cables through zone B.
Carry out the cabling according to the diagram below.
!
The connections must be made exclusively by
qualified personnel when the voltage is off.
CONNECTION DIAGRAM
ON
1 2 3 4
FEELER
PHOTOCELLS 12Vdc
21
ELECTRICAL CONNECTIONS
PHO AND STP INPUTS MUST BE BRIDGED IF NOT USED
!
1
2
3
Safety in
opening
Open
Stop
Step-
Step
B
A
4
5
6
7
8
9 10
11
12
230 Vac (MAINS)
Install differential
thermo-magnetic
circuit breaker
6A (Ic=30mA)
FLASHING LAMP
(24Vdc max15W)
13