7 UNIT LOCATION
These units are typically used for refrigeration and are not
required to withstand earthquakes. Earthquake resistance has
therefore not been checked.
Before setting up the unit in its intended location, the installer
must check the following points:
- These units are designed to be installed and stored inside a
machine room that is sheltered from frost and the elements.
Failure to do so will incur the loss of the manufacturer's
warranty.
- The surface area of the ground or structure must be strong
enough to bear the unit's weight.
- The unit must be perfectly level.
- There must be sufficient free space around and above the unit
to allow servicing and maintenance (see dimensional drawing
provided with unit).
- The room housing the unit must comply with the requirements
of regulation EN 378-3 and other specifications applicable at
8 HANDLING AND POSITIONING
To raise the unit, attach the slings to the designated handling holes.
The data relating to the centre of gravity and the position of the anchorage points are given on the dimensional drawing.
Detailed view of the anchorage point for handling
The unit can be handled with a forklift truck (check the
maximum permissible load of the forklift).
In this case, it is important that the necessary precautions be
taken to avoid the unit sliding on the forks of the forklift. You
must observe the instructions given on the label affixed to the
unit. Failure to observe these instructions may result in the unit
tipping over and causing physical injury.
WARNING:
- Attach the slings only to the anchorage points intended for
this purpose and which are designated on the unit.
- Use slings with a suitable lifting capacity and follow the lifting
instructions on the drawings provided with the unit.
- Caution: the centre of gravity is not necessarily at the middle
of the unit and the forces applied to the slings are not always
identical.
power
DYNACIAT
LG - LGP
A
B
C
For the empty weight, please refer to section 9.1.1
DYNACIAT
Holes for
handling
Ø 35.2 mm
These diagrams are provided for illustrative
purposes only.
Always refer to the pictograms on the unit
700 V
800 V
900 V
2580
the installation site.
- The selected location must be above flood level.
- Allow for drainage of defrosting water.
- Sound level:
• Our units are designed to operate quietly.
• In the installation design, you must take into account the
interior environment for radiated noise and the building type
for airborne and solid-borne noise transmission.
• To ensure vibrations transmitted by solid materials are
reduced as much as possible, it is strongly recommended
to fit anti-vibration mounts between the unit support and
frame (see the section on anti-vibration mounts), as well as
flexible couplings on the hydraulic piping.
• Have an analysis carried out by an acoustics engineer.
IMPORTANT: The ambient temperature must not exceed 50°C
during the unit's off cycles.
power
- Raise and set down the unit carefully. Take care not to tilt it
by more than 15°, as this could adversely affect its operation.
- To avoid damaging the casing, use textile slings with shackles.
- Use a frame with an adjustable centre of gravity to keep the
slings away from the top of the unit.
- Always protect the unit casing (panels, posts, front access
door) from damage during handling. Only the base frame is
designed to withstand handling.
- Safety when lifting can only be guaranteed if all these
instructions are followed.
Otherwise, there is a risk of damage to the equipment and
personal injury.
DYNACIAT
A
1000 V
1100 V
1200 V
996
1400
EN - 4
power
B
1400 V
1600 V
1800 V
2930
2100 V
2400 V
2860