Descargar Imprimir esta página

cecotec ENERGYSILENCE AERO 540 Manual De Instrucciones página 28

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 22
ENGLISH
1. PARTS AND COMPONENTS
Fig. 1.
1.
Canopy
2.
Downrod and hanging ball
3.
Downrod
4.
Mounting bracket
5.
Decorative cover
6.
Motor
7.
Blade
8.
Lamp holder
9.
Glass shade
10. Screws
11.
LED light
2. BEFORE USE
Take all the product components out of the box and make sure all of them are included and in
good conditions.
If any visible signs of damage are observed, contact immediately the Technical Support Service
of Cecotec.
3. PRODUCT ASSEMBLY
The following tools are required to carry out the installation: Screwdriver, flat-head
screwdriver,adjustable pliers or wrench, stepladder, wire cutter, epoxy resin and rated
electrical tape.
General assembly instructions The minimum carrying capacity of the outlet box from which
the fan is hung must be 100 kg.
Fig. 2.
Make sure that the building structure can hold the full weight of the fan.
This fan can be installed on a normal or vaulted ceiling with a down rod. The hanging length
can be extended by using a longer down rod.
Fig. 3.
28
ENERGYSILENCEAERO 540

Publicidad

loading