Descargar Imprimir esta página

AGA MARVEL ML15WSG2 Serie Instrucciones De Instalación, Operación Y Mantenimiento página 18

Publicidad

Idiomas disponibles

Idiomas disponibles

OVERLAY DOOR PANEL INSTALLATION AND SHELVING CONFIGURATIONS
Step 5: Install the door
Carefully open the top and bottom hinges on the door being
careful as there are many pinch points. Place the hinges
over the 4 screws in the cabinet, 2 at the top and 2 at the
bottom and slide the door into position. Tighten the 4 hinge
screws with a phillips screwdriver. (See Figure 13 and
Figure 13a). Place wire harness from the grille and mount
to the bottom of the door with the screw and "P" clamp
removed in step 1. (See Figure 13b). Reconnect the wire
harness, (See Figure 14).
Step 6: Secure the cabinet
Use the #8 x
" black screws from the literature pack to
3
4
secure the counter top to the cabinet top through the holes
in the cabinet "Z" bracket.
Cabinet
"Z" bracket
#8 x
" black
3
4
screws
(3 places)
Figure 25
18
Loading Tips and Suggestions
Your appliance is equipped with a rollout shelf system
which provides maximum access and visibility for the prod-
uct stored on the shelving arrangements listed below.
Single Zone Wine Cellar:
15" (38.1 cm) Wide models:
(6) 4 bottle wire rack
Single Zone Wine Cellar:
24" (61 cm) Wide models:
(5) 8 bottle wire rack
(1) 5 bottle rollout display rack with vibration dampening
mat
Figure 26
Figure 27

Publicidad

loading