Descargar Imprimir esta página

geberit HS01 Manual De Operación página 36

Ocultar thumbs Ver también para HS01:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 128
• To set a new value, repeat the setting
procedure as outlined above.
EN
• After replacing the battery, repeat the setting
procedure as outlined above.
Setting the flush interval
The following table is used to calculate the flush
interval. A flush interval of 3 days is set at the factory.
Table 3:
Minimum requirements in
accordance with
DIN EN 806-4:2010-06
VDI/DVGW 6023:2013-04
Increased requirements
Calculating the flush interval
Flush interval
[Days]
7
3
1

Publicidad

loading