Waeco AirCon Service Center ASC 1300 G Instrucciones De Uso página 113

Estación de mantenimiento de aire acondicionado
Ocultar thumbs Ver también para AirCon Service Center ASC 1300 G:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

AirCon Service Center
8.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection: Select LP / HP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Once all settings have been entered, press ENTER to start the
process.
8.8.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you will be prompted to
disconnect the hoses of the AirCon Service Center from the vehicle air
conditioning system.
1. Disconnect the service hoses (10) and (11) and press ENTER to
confirm.
✓ The service hoses will now be drained. The device is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
EN
HP/LP
PORT
HP
PORT
LP
PORT
ENTER-OK STOP-EXIT
Process start?
ENTER-OK STOP-EXIT
Operation
113

Publicidad

Tabla de contenido
loading

Tabla de contenido