Descargar Imprimir esta página

GE Profile PV977NSS Manual Del Propietario E Instrucciones De Instalación página 16

Campanas de ventilación de chimenea para isla

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION—VENTED TO THE OUTSIDE
STEP 1 MOUNT TEMPLATE
• Align the template with the marks on the ceiling
and tape in place.
– Be sure the template is oriented correctly
with the front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Determine wire access hole location.
• Center punch all screw and determined wire hole
locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
• Drill one 1/2" hole for wires.
• Cut the 8-1/2" duct opening through the ceiling.
STEP 2 INSTALL CEILING SUPPORT
•Using 4 wood screws provided, attach the ceiling
support to the ceiling over duct opening hole
using pilot holes drilled in step 1.
All manuals and user guides at all-guides.com
Installation Instructions
Front
Screws
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
STEP 3 INSTALL LOWER VERTICAL
AND HORIZONTAL SUPPORTS
TO HOOD ASSEMBLY
• Using screws provided, attach the 4 lower
vertical supports to the hood assembly with 4
screws per support.
• Using screws provided, install the horizontal
support in the top outer holes of the vertical
supports.
16
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
10-5/16" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
36" HOOD
TEMPLATE
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
10-5/16" To
Wire Access Hole
as Needed
Centerline of
Pilot Holes
FRONT OF HOOD
31-14772
Printed in Mexico 12-08 JR

Publicidad

loading

Este manual también es adecuado para:

Profile pv977