Descargar Imprimir esta página

GE Profile PV977NSS Manual Del Propietario E Instrucciones De Instalación página 7

Campanas de ventilación de chimenea para isla

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT
for local inspector's use.
IMPORTANT
codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions
for future reference.
• Skill level – Installation of this vent hood requires
basic mechanical and electrical skills.
• Completion time – Approximately 4 to 6 hours
• Proper installation is the responsibility
of the installer.
• Product failure due to improper installation
is not covered under the Warranty.
CAUTION
— Due to the weight
and size of these vent hoods and to reduce
the risk of personal injury or damage
to the product, TWO PEOPLE ARE REQUIRED
FOR PROPER INSTALLATION.
FOR YOUR SAFETY:
WARNING
— Before beginning the
installation, switch power off at service panel and
lock the service disconnecting means to prevent
power from being switched on accidentally. When
the service disconnecting means cannot be locked,
securely fasten a prominent warning device, such
as a tag, to the service panel.
All manuals and user guides at all-guides.com
Island Chimney Vent Hood
— Save these instructions
— Observe all governing
PRODUCT DIMENSIONS
*Height to
ceiling
27-5/8"
* For supplied duct cover ceiling height for vented
installation and recirculating installation, refer to
the table on page 12.
INSTALLATION CLEARANCES
NOTE: Installation height should be measured from
the cooking surface to the bottom of the straight
portion of the hood. This hood must be installed
24" min. and 30" max. above the cooking surface.
The cooking surface should be at least 36" above
the floor. This hood may be vented to the
outdoors, or it can be installed for recirculating
operation.
7
13-1/8"
2-3/8"
35-7/8"
24" Min.*
30" Max.*
36" Min.
* Exact installation
height depends
on ceiling height.
3-1/8"

Publicidad

loading

Este manual también es adecuado para:

Profile pv977