impossible that two or more people co-
ordinate the winches elevating or lowering
the loads, at exactly the same pace. At a
certain point each tower will be extended
to a height different to that of the others.
For this reason it is necessary that the
structure does not stretch and allows
for these differences.
cant, the force generated from the handle
of the winch will deform the structure and
apply a lateral force to the lifts causing
4.7 - Transport:
For the transport of the tower is necessary
to fold the machine lowering every section
completely, then untighten the screw (B)
bar (EX-034). Once the towerlift is com-
rise and close the support system (SA) up
catch pawl (R
Attach the extension bar to the leg with
the magnet.
5. MAINTENANCE.
5.1 -
areas, it should be changed and replaced
immediately with a new one. Do not use
the lift if the cables are in bad condition.
PRO LIFTS S.L.
Only use VMB steel cables reference: DIN
3060 torsion resistant.
5.2 - The lift is supplied from the factory
completely greased. However, it is recom-
mended to periodically grease according
to use, the gearing, the axis bearings, the
-
5.3 - All lifts should undergo an annual
-
technical inspection carried out by an
lift's elements and security systems invol-
ved in the lift's use.
5.4 - Only use original spare parts to gua-
rantee a continued security level. The
user loses all rights to warranty if any spa-
re parts other than originals are used or
to the towerlift.
R)
5.5 - To request a spare part please indi-
K), then
cate the corresponding code which can be
found in this manual together with the lift's
serial number and year of manufacture.
K).
6. GUARANTEE.
The warranty period for this lift is 2 years
from the date of purchase.
PRO LIFTS S.L. promises, that from the
-
date of purchase and during the warranty
period to resolve any faults that may oc-
cur, produced through defect material or
fabrication. Damage caused by improper
red by this warranty.
Depósito legal y copyright . Todos los derechos reservados.
ENGLISH
-
-
-
9